Congratulations on Ethiopia Bottled Water Plant Project Successfully Put Into Use

Publish Time: 2021-04-07     Origin: Site

Congratulations to our Ethiopia customer, the bottled mineral water factory has finished erection successfully, and the water production line is completed. Now the Ethiopia bottled water plant project has been successfully put into use. The customer is very satisfied with the bottled water factory building project.

Reger Steel Structure to Attend the 140th Canton Fair (Phase 2: Oct. 23–27, 2026)

Frequently Asked Questions (FAQ)

1000sqm Prefabricated Steel Warehouse with Partial Two-Story Office

New Product Line Launch: Premium Power Transmission and Telecom Towers for Global Infrastructure Projects

What Is Steel Structure Fabrication Process of Steel Structure Warehouse?