The seafood processing factory building adopts a multi-floor steel frame structure system, total construction area is 4600 sqm, each floor bearing capacity is 500 KG, built in Maldives.
Peru multi-span steel structure factory building with crane, is a irregular 6-span foundry factory, adopts lattice column, total area is 11000 sqm, factory workshop equipped a set of 20 ton crane.
Open Steel Shed (MPA Shed) at Mauritius Container Terminal, Reger provides the service of design, fabrication, and construction of the MPA steel shed project. We get higher praise from the client.
Palm oil processing workshop, construction place is Congo, we sent our engineer to guide installation on site.