Industrial Steel Structure Factory Building for Tires Manufacturing

Publish Time: 2021-07-13     Origin: Site

The steel structure factory project is tire manufacturing workshop for Nexen. Total factory building area is 18,000 square meter, and 10,000 square meter are 2-story. Installation finished  within 4 months with high precision. Reger supply designing, fabrication and installation of factory workshop.

New Product Line Launch: Premium Power Transmission and Telecom Towers for Global Infrastructure Projects

Frequently Asked Questions (FAQ)

1000sqm Prefabricated Steel Warehouse with Partial Two-Story Office

What Is Steel Structure Fabrication Process of Steel Structure Warehouse?

Qingdao New Airport International Express Management Center Warehouse Project