Industrial Steel Structure Factory Building for Tires Manufacturing

Publish Time: 2021-07-13     Origin: Site

The steel structure factory project is tire manufacturing workshop for Nexen. Total factory building area is 18,000 square meter, and 10,000 square meter are 2-story. Installation finished  within 4 months with high precision. Reger supply designing, fabrication and installation of factory workshop.

Frequently Asked Questions (FAQ)

What Is Steel Structure Fabrication Process of Steel Structure Warehouse?

1000sqm Prefabricated Steel Warehouse with Partial Two-Story Office

Steel Structure Warehouse Workshop Building in Dominican Republic

Most Common Standard Primary Framing System for Steel Building