E-MAIL: info@steelstructurescn.com  |  TEL: 0086-15194307960
EnglishEnglish
news
You are here: Home / News
  • Oct
    22
    Qingdao Activa Industrial Park Project Construction Process
    Reger udertake steel structure materials manufacturing and construction of the Activa industrial park project first phase. Total construction area is 85000 sqm
  • Jul
    06
    Tekla Steel Structure 3D Models Cases
    Qingdao Reger Steel Structure supply tekla steel structure 3D models designing for pre-engineered steel buildings.Steel structure tekla 3D model making the steel building design process more comprehensible and accurate.
  • Jun
    03
    New Prefab Office Building of Reger Steel Structure Company
    The new steel structure office building of our company, total building area 3578.38 sqm, 200 steel columns, 55 Integrated floor slab, main construction completed within 5 days
  • Apr
    13
    How to Optimize the Design of Steel Structure Portal Frame
    Optimum design of steel structures is not only to reduce the amount of steel used, but to grasp the overall concept, which involves factors such as load taking, building structural form, force transmission path, material properties and so on.
  • Mar
    17
    What is Structural Steel Fabrication Process
    Structural steel fabrication process: Cutting - Assembly - Gantry automatic submerged arc welding - Straightening - Connections process - Welding - Shot blasting - Spray painting - Packaging
  • Total 15 pages  Go to Page
  • Go
Subscribe
Be the first to know about our latest products.

Contact Us

  Add: No.268 Sancheng Road, Pingdu,           Qingdao, China
  M.P.: +86-15194307960
 WhatsApp/Wechat: +86-15194307960
  info@steelstructurescn.com   
Copyright ©2018 Steel Structure, Metal Structure Buildings, Prefabricated Steel Buildings.Co.,Ltd.All Rights Reserved.