Ceramic factory project is located in Algeria, included ceramic production workshop, mezzanine part of the workshop serves as an office, and finished product storage workshop, total construction area of 9700 sqm.
Ceramic factory steel structure details:
1. Column and beam: welded H section steels with anti-rust grey painting
2. Purlin: Galvanization C purlins
3. Secondary Support: tie Bracing, bracing bars, vertical and horizontal support, angle Steels, all these will improve the stability and durability of the whole structural steel building
4. Roof and wall cladding sheet: Alu-zinc color-coated steel sheet in the thickness of 0.5mm
5. Window: Aluminum-alloy sliding windows
6. Door: steel door and fire-proof door
7. Construction service: On-site erection for 7 months.